Volume 6, Issue 1 (11-2012)                   2012, 6(1): 1327-1350 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Afshar S, Ghafori M, Lashkaripur G, Arian M, Musavimadah M. Investigation of optimum depth for tunnel of Mashhad metro line 2. Journal of Engineering Geology 2012; 6 (1) :1327-1350
URL: http://jeg.khu.ac.ir/article-1-381-en.html
Abstract:   (7862 Views)
With respect to development of underground structures and their high construction costs in intra- and inter-municipal transportation, it is necessary to study the stability of such structures. In this research, tunnel stability of Mashhad Metro line 2 with 17 km length is studied. First, the type of sediments and geotechnical properties in Mashhad Plain are investigated. The SPT profiles were prepared using Rock Work 2006 software. The soil classification tests and XRD results show that the soils in this line are mostly clay such as Illite and Kaolinite types. Afterwards, because most of the soils in this line are characterized as fine grained, the ground settlement using PLAXIS V8 software was performed. According to the numerical modeling and the depth of tunnel, the optimum depth for tunnel was determined.
Full-Text [PDF 1591 kb]   (2568 Downloads)    
Type of Study: Other | Subject: En. Geology
Accepted: 2016/10/5 | Published: 2016/10/5

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Engineering Geology

Designed & Developed by : Yektaweb