Dear users,
This is our new website
(we are launching the new one in order to improve our communication and provide better services to the editors and authors. So we will upload all data soon).


Please click here to visit our current website, and also to submit your paper
:
 
www.ijsom.com 


 Thanks for your patience during relocation.

Feel free to contact us via info@ijsom.com and ijsom.info@gmail.com

   [Home ] [Archive]    
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Indexing Databases

AWT IMAGE
AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

..
:: Volume 3, Issue 1 (5-2016) ::
2016, 3(1): 1215-1233 Back to browse issues page
Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities
Seyyed Mohammad Hassan Hosseini *
Industrial Engineering and Management Department, Shahrood University of Thechnology, Shahrood, Iran , sh.hosseini51@gmail.com
Abstract:   (3913 Views)
Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan). A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.
Keywords: Scheduling, Hybrid flow shop, Assembly, Aging effects, Preventive maintenance activities
     
Type of Study: مقاله پژوهشی |
ePublished: 2017/09/28
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML     Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Hosseini S M H. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities. Journal title 2016; 3 (1) :1215-1233
URL: http://system.khu.ac.ir/ijsom/article-1-2669-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 3, Issue 1 (5-2016) Back to browse issues page
International Journal of Supply and Operations Management International Journal of Supply and Operations Management
Persian site map - English site map - Created in 0.08 seconds with 41 queries by YEKTAWEB 4666