Dear users,
This is our new website
(we are launching the new one in order to improve our communication and provide better services to the editors and authors. So we will upload all data soon).


Please click here to visit our current website, and also to submit your paper
:
 
www.ijsom.com 


 Thanks for your patience during relocation.

Feel free to contact us via info@ijsom.com and ijsom.info@gmail.com

   [Home ] [Archive]    
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Indexing Databases

AWT IMAGE
AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

..
:: Accepted articles (In Press) ::
Back to the articles list Back to browse issues page
Using Metaheuristic Algorithms for Solving a Hub Location Problem: Application in Passive Optical Network Planning
Masoud Rabbani * 1, Mohammad Ravanbakhsh2 , Hamed Farrokhi-Asl3 , Mahyar Taheri2
1- School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran , mrabani@ut.ac.ir
2- School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
3- School of Industrial Engineering, Iran University of Science & Technology, Tehran, Iran
Abstract:   (18076 Views)
Nowadays, fiber-optic due to having greater bandwidth and being more efficient compared with other similar technologies, are counted as one the most important tools for data transfer. In this article, an integrated mathematical model for a three-level fiber-optic distribution network with consideration of simultaneous backbone and local access networks is presented in which the backbone network is a ring and the access networks has a star-star topology. The aim of the model is to determine the location of the central offices and splitters, how connections are made between central offices, and allocation of each demand node to a splitter or central office in a way that the wiring cost of fiber optical and concentrator installation are minimized. Moreover, each user’s desired bandwidth should be provided efficiently. Then, the proposed model is validated by GAMS software in small-sized problems, afterwards the model is solved by two meta-heuristic methods including differential evolution (DE) and genetic algorithm (GA) in large-scaled problems and the results of two algorithms are compared with respect to computational time and objective function obtained value. Finally, a sensitivity analysis is provided.
Keyword: Fiber-optic, telecommunication network, hub-location, passive splitter, three-level network.
Keywords: Fiber-optic, Telecommunication network, Hub-location, Passive splitter, Three-level network
     
Type of Study: مقاله پژوهشی |
ePublished: 2017/01/15
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML     Print



Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Back to the articles list Back to browse issues page
International Journal of Supply and Operations Management International Journal of Supply and Operations Management
Persian site map - English site map - Created in 0.09 seconds with 41 queries by YEKTAWEB 4666