Dear users,
This is our new website
(we are launching the new one in order to improve our communication and provide better services to the editors and authors. So we will upload all data soon).


Please click here to visit our current website, and also to submit your paper
:
 
www.ijsom.com 


 Thanks for your patience during relocation.

Feel free to contact us via info@ijsom.com and ijsom.info@gmail.com

   [Home ] [Archive]    
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Indexing Databases

AWT IMAGE
AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

AWT IMAGE

..
:: Volume 3, Issue 2 (8-2016) ::
2016, 3(2): 1253-1266 Back to browse issues page
A Supply Chain Design Problem Integrated Facility Unavailabilities Management
Fouad Maliki * 1, Mustapha Anwar Brahami2 , Mohammed Dahane3 , Zaki Sari4
1- Preparatory school on sciences and techniques, MELT Laboratory, Tlemcen, Algeria , f.maliki@epst-tlemcen.dz
2- Preparatory school on sciences and techniques, MELT Laboratory, Tlemcen, Algeria
3- Ecole Nationale d’Ingénieurs de Metz (ENIM), Laboratoire de Génie Industriel et de Production de Metz (LGIPM), Metz, France
4- Abou Bekr Belkaid University, MELT Laboratory, Tlemcen, Algeria
Abstract:   (4536 Views)
A supply chain is a set of facilities connected together in order to provide products to customers. The supply chain is subject to random failures caused by different factors which cause the unavailability of some sites. Given the current economic context, the management of these unavailabilities is becoming a strategic choice to ensure the desired reliability and availability levels of the different supply chain facilities. In this work, we treat two problems related to the field of supply chain, namely the design and unavailabilities management of logistics facilities. Specifically, we consider a stochastic distribution network with consideration of suppliers' selection, distribution centres location (DCs) decisions and DCs’ unavailabilities management. Two resolution approaches are proposed. The first approach called non-integrated consists on define the optimal supply chain structure using an optimization approach based on genetic algorithms (GA), then to simulate the supply chain performance with the presence of DCs failures. The second approach called integrated approach is to consider the design of the supply chain problem and unavailabilities management of DCs in the same model. Note that, we replace each unavailable DC by performing a reallocation using GA in the two approaches. The obtained results of the two approaches are detailed and compared showing their effectiveness.
Keywords: Supply Chain Management, Location-Allocation, Suppliers Selection, Genetic Algorithms
     

ePublished: 2017/09/28
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML     Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Maliki F, Brahami M A, Dahane M, Sari Z. A Supply Chain Design Problem Integrated Facility Unavailabilities Management. Journal title 2016; 3 (2) :1253-1266
URL: http://system.khu.ac.ir/ijsom/article-1-2672-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 3, Issue 2 (8-2016) Back to browse issues page
International Journal of Supply and Operations Management International Journal of Supply and Operations Management
Persian site map - English site map - Created in 0.1 seconds with 41 queries by YEKTAWEB 4666